Pipelines Energy Transfer

Trunkline Gas notices

Current critical notices, non-critical notices and planned service outages for Trunkline Gas, an interstate natural gas pipeline operated by Energy Transfer. Collected from the pipeline's public informational postings and refreshed every 30 minutes.

Updated Nov 26, 2026, 4:20 PM CT

112Critical
4Planned Service Outage
103Non-Critical
See Trunkline Gas on the map Search and filter these notices

Current notices

Current Trunkline Gas notices
Posted (CT)CategoryTypeSubjectEffectiveEndsNotice ID
2026-11-25 08:02 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2026-11-25 08:02 – 75624
2026-11-24 10:44 Non-Critical Other South Mississippi Project Binding Open Season Extension 2026-11-24 10:44 – 75600
2026-11-23 07:22 Critical Maintenance TGC Edna 100-1 & Cypress 100-1 Line Pigging Update #2 2026-11-23 07:22 – 75560
2026-11-18 12:44 Critical Maintenance TGC Edna 100-1 & Cypress 100-1 Line Pigging Update #1 2026-11-18 12:44 – 75441
2026-11-09 10:53 Critical Maintenance TGC Kountze Station Outage 2026-11-09 10:53 – 75084
2026-11-05 09:56 Critical Maintenance TGC Centerville Station Maintenance 2026-11-05 09:56 – 74933
2026-11-04 14:32 Non-Critical Other ROFR Winning Bid TG-0044 2026-11-04 14:32 – 74914
2026-11-04 09:03 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 10/26 2026-11-04 09:03 – 74898
2026-10-28 09:33 Critical Maintenance TGC Edna 100-1 & Cypress 100-1 Line Pigging 2026-10-28 09:33 – 74570
2026-10-28 08:54 Non-Critical Other South Mississippi Project Binding Open Season 2026-10-28 08:54 – 74567
2026-10-27 08:14 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2026-10-27 08:14 – 74513
2026-10-23 15:08 Non-Critical Other Trunkline Gas Company Firm Transportation Open Season (notice ID 73488) – Results 2026-10-23 15:08 – 74366
2026-10-19 15:06 Non-Critical Phone List Marketing Contacts, Phone Numbers and Email Addresses 2026-10-19 15:06 – 74190
2026-10-06 12:30 Non-Critical Other Trunkline Open Season 2026-10-06 12:30 – 73488
2026-10-06 10:26 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 09/26 2026-10-06 10:26 – 73482
2026-10-06 08:20 Non-Critical Rates and Charges Proposed Fuel Reimbursement Percentages for November 1, 2026 2026-10-06 08:20 – 73476
2026-09-29 08:16 Non-Critical Other Right of First Refusal Capacity – TG-0044 Revision 2026-09-29 08:16 – 73087
2026-09-28 13:14 Critical Maintenance TGC Longville Station Maintenance 2026-09-28 13:14 – 73029
2026-09-24 08:04 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2026-09-24 08:04 – 72743
2026-09-09 10:47 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 08/26 2026-09-09 10:47 – 68697
2026-09-03 14:18 Critical Force Majeure TGC Force Majeure Lifted: Kountze Station Additional Power Outages 2026-09-03 14:18 – 68344
2026-09-03 09:31 Critical Force Majeure TGC Force Majeure REINSTATED: Kountze Station Additional Power Outages 2026-09-03 09:31 – 68318
2026-09-03 07:40 Critical Force Majeure TGC Force Majeure Lifted: Kountze Station Power Outage 2026-09-03 07:40 – 68317
2026-09-02 09:37 Critical Force Majeure TGC Force Majeure: Kountze Station Power Outage 2026-09-02 09:37 – 68277
2026-08-26 14:43 Non-Critical Other Right of First Refusal Capacity – TG-0044 2026-08-26 14:43 – 68048
2026-08-26 08:38 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE Z1A 2026-08-26 08:38 – 68029
2026-08-24 14:09 Critical Maintenance TGC Henry Hub High Pressure Outage 2026-08-24 14:09 – 67946
2026-08-11 12:38 Critical Maintenance TGC Henry Hub High Pressure Outage 2026-08-11 12:38 – 67362
2026-08-06 08:34 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 07/26 2026-08-06 08:34 – 67147
2026-08-05 08:30 Critical Maintenance TGC Transco Ragley Outage 2026-08-05 08:30 – 67108
2026-07-31 07:26 Critical Maintenance TGC Kaplan Station Maintenance 2026-07-31 07:26 – 66948
2026-07-27 08:03 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE Z1A 2026-07-27 08:03 – 66751
2026-07-08 14:05 Critical Maintenance TGC Edna 100 Line Hydrotest 2026-07-08 14:05 – 65983
2026-07-06 14:21 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 06/26 2026-07-06 14:21 – 65893
2026-06-30 15:09 Critical Maintenance Trunkline South Texas Maintenance Update #6 - Completed 2026-06-30 15:09 – 65636
2026-06-24 13:29 Critical Maintenance Trunkline Planned Maintenance Gulf South Lincoln Road 2026-06-24 13:29 – 65347
2026-06-24 13:26 Critical Maintenance Trunkline South Texas Maintenance Update #5 2026-06-24 13:26 – 65346
2026-06-04 08:09 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 05/26 2026-06-04 08:09 – 64494
2026-06-03 13:27 Non-Critical Phone List Marketing Contacts, Phone Numbers and Email Addresses 2026-06-03 13:27 – 64463
2026-06-02 12:22 Critical Maintenance Trunkline South Texas Maintenance Update #4 2026-06-02 12:22 – 64428
2026-05-27 09:34 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2026-05-27 09:34 – 64128
2026-05-06 13:48 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 04/26 2026-05-06 13:48 – 63412
2026-04-22 13:19 Critical Other TGC Kaplan 300-1 line Hydrotest Update 2026-04-22 13:19 – 63175
2026-04-09 09:58 Critical Maintenance Trunkline South Texas Maintenance Update #3 2026-04-09 09:58 – 62815
2026-04-07 09:54 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 03/26 2026-04-07 09:54 – 62768
2026-03-31 10:42 Critical Maintenance Trunkline South Texas Maintenance Update #2 2026-03-31 10:42 – 62618
2026-03-31 07:39 Non-Critical Other Right of First Refusal Capacity – TG-0045 2026-03-31 07:39 – 62613
2026-03-31 07:37 Non-Critical Other Right of First Refusal Capacity – TG-0044 2026-03-31 07:37 – 62612
2026-03-26 12:35 Non-Critical Other Right of First Refusal Capacity – TG-0043 2026-03-26 12:35 – 62545
2026-03-24 08:50 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2026-03-24 08:50 – 62485
2026-03-16 13:13 Critical Maintenance TGC Longville Station Unplanned Maintenance Completed 2026-03-16 13:13 – 62359
2026-03-10 13:15 Critical Maintenance Trunkline South Texas Maintenance Update #1 2026-03-10 13:15 – 62234
2026-03-06 07:45 Non-Critical Rates and Charges Proposed Fuel Reimbursement Percentages for April 1, 2026 2026-03-06 07:45 – 62139
2026-03-05 14:07 Critical Maintenance TGC Longville Noise Survey 2026-03-05 14:07 – 62130
2026-03-05 14:04 Critical Maintenance TGC Kaplan Station Maintenance 2026-03-05 14:04 – 62128
2026-03-04 10:00 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 02/26 2026-03-04 10:00 – 62082
2026-03-02 14:26 Critical Maintenance TGC Pollock Station Outage 2026-03-02 14:26 – 62045
2026-03-02 14:22 Critical Maintenance TGC Longville Station Maintenance 2026-03-02 14:22 – 62044
2026-03-02 14:16 Critical Maintenance TGC Kountze Station Outage 2026-03-02 14:16 – 62043
2026-03-02 14:07 Critical Other TGC Kaplan 300-1 line Hydrotest 2026-03-02 14:07 – 62042
2026-03-02 07:18 Critical Maintenance Trunkline South Texas Maintenance 2026-03-02 07:18 – 62028
2026-02-24 08:12 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2026-02-24 08:12 – 61854
2026-02-19 15:12 Critical Maintenance TGC Kaplan Station Maintenance Update #1 2026-02-19 15:12 – 61707
2026-02-16 12:57 Critical Maintenance TGC Longville Station Unplanned Maintenance 2026-02-16 12:57 – 61631
2026-02-05 15:09 Critical Maintenance Trunkline Pigging: Longville Compressor Station to Gate Valve 203A 2026-02-05 15:09 – 61416
2026-02-05 06:59 Critical Operational Alert Weather Alert Lifted 2026-02-05 06:59 – 61391
2026-02-04 14:48 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 01/26 2026-02-04 14:48 – 61365
2026-01-30 13:09 Non-Critical Other Trunkline Gas Company FT Open Season 2026-01-30 13:09 – 61072
2026-01-30 09:32 Critical Maintenance TGC Kaplan Station Maintenance 2026-01-30 09:32 – 61068
2026-01-27 08:12 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2026-01-27 08:12 – 60934
2026-01-13 08:15 Critical Operational Alert Trunkline Weather Alert 2026-01-13 08:15 – 60518
2026-01-06 13:42 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 12/25 2026-01-06 13:42 – 60441
2026-01-05 10:20 Non-Critical Planned Service Outage TGC 2026 Pipeline Outage and Maintenance Summary 2026-01-05 10:20 – 60412
2026-01-05 10:20 Planned Service Outage TGC 2026 Pipeline Outage and Maintenance Summary 2026-01-05 10:20 – 60412
2025-12-16 08:02 Critical Operational Alert Weather Alert Lifted 2025-12-16 08:02 – 60101
2025-12-10 07:26 Critical Operational Alert Trunkline Weather Alert 2025-12-10 07:26 – 59980
2025-12-03 13:50 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 11/25 2025-12-03 13:50 – 59868
2025-11-24 08:22 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2025-11-24 08:22 – 59763
2025-11-07 11:13 Critical Maintenance TGC Centerville Station Maintenance 2025-11-07 11:13 – 59647
2025-11-07 11:11 Critical Maintenance TGC Kaplan Station Maintenance Update #1 2025-11-07 11:11 – 59646
2025-11-06 08:40 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 10/25 2025-11-06 08:40 – 59637
2025-11-03 12:38 Non-Critical Other Trunkline Open Season 2025-11-03 12:38 – 59592
2025-10-28 07:51 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2025-10-28 07:51 – 59526
2025-10-22 14:46 Critical Maintenance TGC Kaplan Station Maintenance 2025-10-22 14:46 – 59407
2025-10-16 09:43 Non-Critical Phone List Marketing Contacts, Phone Numbers and Email Addresses 2025-10-16 09:43 – 59273
2025-10-07 07:23 Non-Critical Rates and Charges Proposed Fuel Reimbursement Percentages for November 1, 2025 2025-10-07 07:23 – 59047
2025-10-06 15:20 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 09/25 2025-10-06 15:20 – 59035
2025-09-08 09:03 Critical Maintenance TGC Kountze Station Outage 2025-09-08 09:03 – 58104
2025-09-05 08:55 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 08/25 2025-09-05 08:55 – 57988
2025-08-26 13:23 Critical Maintenance TGC Kaplan Station Maintenance 2025-08-26 13:23 – 57589
2025-08-26 08:24 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2025-08-26 08:24 – 57579
2025-08-25 07:07 Critical Maintenance TGC Centerville Station Maintenance 2025-08-25 07:07 – 57529
2025-08-22 06:58 Non-Critical Other Right of First Refusal Capacity – TG-0041 2025-08-22 06:58 – 57430
2025-08-13 14:56 Critical Maintenance TGC Centerville Station Maintenance 2025-08-13 14:56 – 56923
2025-08-12 13:59 Critical Maintenance TGC Cypress Hooks Outage Update #1 2025-08-12 13:59 – 56860
2025-08-05 13:30 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 07/25 2025-08-05 13:30 – 56572
2025-08-05 10:46 Critical Maintenance TGC Pollock Station Maintenance 2025-08-05 10:46 – 56567
2025-08-05 10:42 Critical Maintenance TGC Cypress Hooks Outage 2025-08-05 10:42 – 56566
2025-07-28 14:02 Critical Maintenance TGC Longville Station Maintenance 2025-07-28 14:02 – 56099
2025-07-28 08:28 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2025-07-28 08:28 – 56065
2025-07-17 13:14 Non-Critical Phone List Marketing Contacts, Phone Numbers and Email Addresses 2025-07-17 13:14 – 55408
2025-07-17 08:23 Critical Maintenance TGC Reduced Capacity at Longville Station Update 2025-07-17 08:23 – 55399
2025-07-07 09:22 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 06/25 2025-07-07 09:22 – 54917
2025-06-30 09:02 Critical Maintenance Gillis Hub (formerly LA Storage) Outage Update #2 2025-06-30 09:02 – 54602
2025-06-27 10:43 Critical Maintenance Trunkline Pigging Update #1 2025-06-27 10:43 – 54517
2025-06-27 10:37 Critical Maintenance Gillis Hub (formerly LA Storage) Outage Update #1 2025-06-27 10:37 – 54516
2025-06-24 12:23 Critical Maintenance Gillis Hub (formerly LA Storage) Outage 2025-06-24 12:23 – 54395
2025-06-18 14:33 Critical Maintenance Trunkline Pigging: Longville Compressor Station to Lake Charles LNG Terminal 2025-06-18 14:33 – 54172
2025-06-04 10:24 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 05/25 2025-06-04 10:24 – 53738
2025-05-27 08:51 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2025-05-27 08:51 – 53563
2025-05-19 14:34 Critical Maintenance TGC Kaplan Station Maintenance - Postponed 2025-05-19 14:34 – 53388
2025-05-16 09:42 Critical Maintenance TGC Maintenance 2025-05-16 09:42 – 53317
2025-05-16 07:12 Critical Maintenance TGC Kaplan Station Maintenance 2025-05-16 07:12 – 53315
2025-05-06 13:03 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 04/25 2025-05-06 13:03 – 53155
2025-05-05 08:10 Critical Other New Nominations and Scheduling On-Call Phone Number Reminder 2025-05-05 08:10 – 53136
2025-04-08 09:14 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 03/25 2025-04-08 09:14 – 52668
2025-03-27 08:08 Non-Critical Phone List Marketing Contacts, Phone Numbers and Email Addresses 2025-03-27 08:08 – 52421
2025-03-26 10:04 Critical Other New Nominations and Scheduling On-Call Phone Number 2025-03-26 10:04 – 52402
2025-03-25 08:06 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2025-03-25 08:06 – 52367
2025-03-20 10:42 Critical Maintenance TGC Kaplan Station Maintenance Update #2 2025-03-20 10:42 – 52304
2025-03-20 07:49 Critical Maintenance TGC Reduced Capacity at Longville Station 2025-03-20 07:49 – 52301
2025-03-19 08:01 Critical Maintenance TGC Kaplan Station Maintenance Update #1 2025-03-19 08:01 – 52286
2025-03-06 13:29 Non-Critical Rates and Charges Proposed Fuel Reimbursement Percentages for April 1, 2025 2025-03-06 13:29 – 52138
2025-03-06 09:43 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 02/25 2025-03-06 09:43 – 52134
2025-02-24 08:08 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2025-02-24 08:08 – 52024
2025-02-22 13:37 Critical Weather Alert Trunkline Weather Alert Lifted 2025-02-22 13:37 – 51986
2025-02-18 14:49 Critical Maintenance TGC Kaplan Station Maintenance 2025-02-18 14:49 – 51896
2025-02-18 13:49 Critical Maintenance TGC Kountze Station Outage 2025-02-18 13:49 – 51890
2025-02-18 13:43 Critical Maintenance TGC Longville Station Maintenance 2025-02-18 13:43 – 51889
2025-02-13 08:58 Critical Weather Alert Weather Alert 2025-02-13 08:58 – 51750
2025-02-06 07:43 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 01/25 2025-02-06 07:43 – 51612
2025-01-27 08:00 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2025-01-27 08:00 – 51407
2025-01-24 07:30 Critical Weather Alert Weather Alert Lifted 2025-01-24 07:30 – 51284
2025-01-13 07:44 Non-Critical Planned Service Outage TGC 2025 Pipeline Outage and Maintenance Summary 2025-01-13 07:44 – 50902
2025-01-13 07:44 Planned Service Outage TGC 2025 Pipeline Outage and Maintenance Summary 2025-01-13 07:44 – 50902
2025-01-06 08:51 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 12/24 2025-01-06 08:51 – 50636
2025-01-02 08:26 Critical Weather Alert Weather Alert 2025-01-02 08:26 – 50498
2024-12-31 09:41 Critical Maintenance TGC Longville Station Unplanned Maintenance Completed 2024-12-31 09:41 – 50446
2024-12-30 07:51 Critical Maintenance TGC Longville Station Unplanned Maintenance 2024-12-30 07:51 – 50433
2024-12-09 08:59 Critical Maintenance TGC Kaplan Station Maintenance 2024-12-09 08:59 – 50016
2024-12-04 15:03 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 11/24 2024-12-04 15:03 – 49931
2024-11-22 08:35 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2024-11-22 08:35 – 49665
2024-11-06 08:48 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 10/24 2024-11-06 08:48 – 49196
2024-11-05 06:41 Critical Maintenance TGC Kaplan Station Maintenance 2024-11-05 06:41 – 49143
2024-11-01 12:31 Non-Critical Other ETIH South Mississippi Project Open Season – EXTENSION 2024-11-01 12:31 – 49054
2024-10-28 08:22 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2024-10-28 08:22 – 48973
2024-10-22 07:54 Critical Maintenance TGC Longville Station Unplanned Maintenance Completed 2024-10-22 07:54 – 48875
2024-10-16 16:22 Non-Critical Other ETIH South Mississippi Project Open Season 2024-10-16 16:22 – 48793
2024-10-10 09:21 Critical Maintenance TGC Centerville Station Maintenance 2024-10-10 09:21 – 48705
2024-10-07 10:26 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 09/24 2024-10-07 10:26 – 48664
2024-10-04 07:43 Non-Critical Rates and Charges Proposed Fuel Reimbursement Percentages for November 1, 2024 2024-10-04 07:43 – 48593
2024-10-01 08:36 Non-Critical Other Right of First Refusal Capacity – TG-0040 2024-10-01 08:36 – 48471
2024-09-25 08:07 Non-Critical Other NOTICE OF PROPOSED OPERATIONAL SALE 2024-09-25 08:07 – 48297
2024-09-23 12:41 Critical Maintenance TGC Kaplan Station Maintenance 2024-09-23 12:41 – 48233
2024-09-11 07:58 Critical Weather Alert Hurricane Francine Update #1 2024-09-11 07:58 – 47794
2024-09-10 11:17 Critical Weather Alert Tropical Storm Francine 2024-09-10 11:17 – 47763
2024-09-05 08:59 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 08/24 2024-09-05 08:59 – 47590
2024-08-26 08:06 Non-Critical Other Notice of Proposed Operational Sale 2024-08-26 08:06 – 47221
2024-08-26 07:34 Non-Critical Other Right of First Refusal Capacity – TG-0039 2024-08-26 07:34 – 47220
2024-08-07 14:07 Critical Maintenance TGC Kaplan Station Maintenance 2024-08-07 14:07 – 46611
2024-08-06 16:31 Critical Operational Alert Unplanned Outage: Sabine @ Lake Charles Meter Station Completed 2024-08-06 16:31 – 46582
2024-08-06 10:53 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 07/24 2024-08-06 10:53 – 46566
2024-08-05 15:26 Critical Operational Alert Unplanned Outage: Sabine @ Lake Charles Meter Station 2024-08-05 15:26 – 46545
2024-07-26 14:01 Critical Maintenance Longville Station Unplanned Maintenance 2024-07-26 14:01 – 46277
2024-07-25 07:59 Non-Critical Other Notice of Proposed Operational Sale 2024-07-25 07:59 – 46231
2024-07-19 09:05 Critical Maintenance TGC Longville Station Unplanned Maintenance Completed 2024-07-19 09:05 – 46059
2024-07-17 08:58 Critical Maintenance Longville Station Unplanned Maintenance 2024-07-17 08:58 – 45983
2024-07-12 08:58 Critical Maintenance TGC Kountze Station Outage Completed 2024-07-12 08:58 – 45816
2024-07-11 08:54 Critical Maintenance TGC Longville Station Outage - Safeties and Electrical Inspection Update #1 2024-07-11 08:54 – 45778
2024-07-09 14:55 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 06/24 2024-07-09 14:55 – 45727
2024-06-26 08:26 Non-Critical Other Notice of Proposed Operational Sale 2024-06-26 08:26 – 45367
2024-06-25 11:46 Critical Maintenance TGC Kaplan Station Maintenance 2024-06-25 11:46 – 45328
2024-06-25 09:32 Critical Maintenance TGC Longville Station Outage - Cancelled 2024-06-25 09:32 – 45320
2024-06-24 08:46 Critical Maintenance TGC Longville Station Outage - Safeties and Electrical Inspection 2024-06-24 08:46 – 45287
2024-06-24 08:36 Critical Maintenance TGC Beeville 100 Line Pipe Replacement 2024-06-24 08:36 – 45286
2024-06-24 08:26 Critical Maintenance TGC Longville Station Outage 2024-06-24 08:26 – 45285
2024-06-24 08:16 Critical Maintenance TGC Kountze Station Outage 2024-06-24 08:16 – 45284
2024-06-05 09:24 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 05/24 2024-06-05 09:24 – 44691
2024-05-29 09:22 Critical Maintenance TGC Kaplan Station Unplanned Maintenance 2024-05-29 09:22 – 44463
2024-05-28 12:30 Critical Other Bridgeline Meter Station Upgrade 2024-05-28 12:30 – 44434
2024-05-28 08:19 Non-Critical Other Notice of Proposed Operational Sale 2024-05-28 08:19 – 44425
2024-05-23 07:16 Critical Maintenance TGC Kaplan Station Maintenance Completed 2024-05-23 07:16 – 44258
2024-05-20 09:00 Critical Maintenance TGC Kaplan Station Maintenance 2024-05-20 09:00 – 44178
2024-05-13 10:33 Non-Critical Other Operational Guidelines for Receipt of Renewable Natural Gas from RNG Receipt Points 2024-05-13 10:33 – 43963
2024-05-06 13:49 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 04/24 2024-05-06 13:49 – 43734
2024-04-26 14:06 Non-Critical Other Contracting of Off-System Capacity 2024-04-26 14:06 – 43558
2024-04-25 07:55 Non-Critical Other Notice of Proposed Operational Sale 2024-04-25 07:55 – 43524
2024-04-11 09:10 Critical Maintenance TGC Longville Station Outage Update #2 Cancelled 2024-04-11 09:10 – 43372
2024-04-09 06:48 Critical Maintenance TGC Longville Station Outage Update #1 2024-04-09 06:48 – 43348
2024-04-03 08:56 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 03/24 2024-04-03 08:56 – 43292
2024-03-25 08:18 Non-Critical Other Notice of Proposed Operational Sale 2024-03-25 08:18 – 43200
2024-03-19 08:57 Critical Maintenance 03/19/2024 TGC Longville Station Outage 2024-03-19 08:57 – 43181
2024-03-06 14:13 Non-Critical Rates and Charges Proposed Fuel Reimbursement Percentages for April 1, 2024 2024-03-06 14:13 – 43093
2024-03-05 14:12 Non-Critical Cash Out Spot Price for Cash-Out Volumes - 02/24 2024-03-05 14:12 – 43083
2024-03-05 13:15 Non-Critical Planned Service Outage TGC 2024 Pipeline Outage and Maintenance Summary 2024-03-05 13:15 – 32769
2024-03-05 13:15 Planned Service Outage TGC 2024 Pipeline Outage and Maintenance Summary 2024-03-05 13:15 – 32769
2024-02-27 12:52 Critical Other LA Storage Meter Tube Inspection Update #1 2024-02-27 12:52 – 43033
2024-02-27 08:20 Non-Critical Other Notice of Proposed Operational Sale 2024-02-27 08:20 – 43029
2024-02-26 13:56 Non-Critical Other Trunkline Open Season Results 2024-02-26 13:56 – 43024
2024-02-26 07:55 Critical Maintenance TGC Kountze Station Outage Update #1 2024-02-26 07:55 – 43017

Showing the newest 200 of 219. See all 219 in the notice list →

About these notices

Interstate pipelines must publish notices that affect their shippers. Critical notices can affect scheduling or bring penalties (for example operational flow orders, force majeure and capacity cuts). Planned service outages are scheduled maintenance that reduces capacity, and non-critical notices are informational. Times are U.S. Central. Learn more in Regulation & Pipeline Notices.

Always confirm details on Trunkline Gas's own informational postings website before acting on a notice.