Interstate pipelines don't buy or sell gas. They sell transportation. Shippers such as producers, marketers, utilities, power plants and LNG exporters contract for capacity, then nominate the gas they want moved each day. What kind of service you hold decides both what you pay and how likely your gas is to flow on a constrained day.
Shippers and open access
Since FERC's Order 636 in 1992, interstate pipelines have operated as open-access transporters. They must offer service to any creditworthy shipper on the same terms, and they keep the gas merchant business separate from transportation. The pipeline's tariff, filed with FERC, spells out every service, rate and rule.
Firm and interruptible service
| Firm transportation (FT) | Interruptible transportation (IT) | |
|---|---|---|
| What you get | A reserved right to move up to a set amount every day | Service only when there's spare capacity |
| Scheduling priority | Highest, especially at primary points | Lowest: cut first when capacity is short |
| How you pay | Monthly reservation charge, whether you use it or not, plus usage charges | Usage charge only on gas actually moved |
| Who uses it | Utilities, power plants, LNG exporters, producers needing guaranteed takeaway | Opportunistic shippers, and anyone filling gaps |
Pipelines also offer storage services (firm and interruptible), no-notice service that lets utilities take swings without nominating them in advance, and park and loan services.
Contract terms
- MDQ (maximum daily quantity): the most gas the contract lets you move per day, also called contract demand or MDTQ.
- Primary receipt and delivery points: the specific points named in the contract. Firm service at primary points has the top scheduling priority.
- Secondary points: other points you can use under the same contract, with lower priority than primary firm.
- Path: the route between primary receipt and primary delivery points. Using secondary points within the path usually ranks above going outside it.
- Term: from a single day to 20+ years. New pipelines are built on long-term firm contracts signed in open seasons.
What transportation costs
Reservation (demand) charge
A fixed monthly fee per unit of MDQ, often shown in $/Dth/month or as a daily equivalent. You pay it whether or not you ship gas, and it covers most of the pipeline's fixed costs.
Commodity (usage) charge
A per-Dth charge on gas actually transported, usually small for firm service. For interruptible service, the usage rate is the whole price.
Fuel retention and lost-and-unaccounted-for (LAUF)
Pipelines keep a percentage of the gas you deliver at the receipt point, in kind, to run compressors and cover small measurement losses. If fuel is 1.5%, you must deliver about 1,015 Dth to have 1,000 Dth arrive at your delivery point. Fuel rates are reset periodically and often differ by zone.
Surcharges
Smaller add-ons such as the ACA (Annual Charge Adjustment, which funds FERC), electric power cost trackers, and modernization or other approved surcharges. "All-in" commodity cost usually means usage charge plus surcharges.
Recourse, discounted and negotiated rates
- Maximum recourse rate: the FERC-approved cost-based rate in the tariff, available to anyone.
- Discounted rate: a lower rate the pipeline offers, often to compete with other pipelines.
- Negotiated rate: a rate agreed with a shipper that can differ from the recourse rate. It's common for expansion projects and is usually reported publicly.
Capacity release and the secondary market
Firm shippers who don't need all their capacity can release it to other shippers through the pipeline's capacity-release system, posted on its informational postings site. The releasing shipper gets credit for what the replacement shipper pays. Releases can be for a day, a month or longer, and some must be posted for bidding. Shippers also do "asset management arrangements" and buy delivered gas from marketers who hold capacity.
- Firm service costs a reservation fee but has the highest priority. Interruptible is pay-as-you-go but gets cut first.
- Total cost = reservation + usage + fuel (in kind) + surcharges.
- Fuel is taken at receipt, so you must put in more gas than arrives.
- Unused firm capacity can be resold through capacity release.
Key terms
- Shipper
- The party that contracts with a pipeline to move gas.
- Tariff
- The pipeline's FERC-approved rulebook of services, rates and terms.
- FT / IT
- Firm transportation and interruptible transportation.
- MDQ
- Maximum daily quantity under a contract.
- Primary / secondary point
- Contracted points (higher priority) and alternate points (lower priority).
- Reservation charge
- A fixed monthly fee for holding firm capacity.
- Commodity (usage) charge
- A per-Dth fee on gas actually moved.
- Fuel retention
- The percentage of gas the pipeline keeps, in kind, to run its compressors.
- ACA
- Annual Charge Adjustment surcharge that funds FERC.
- Capacity release
- Reselling unused firm capacity to another shipper.
- Open season
- A period when a pipeline takes bids for new or available capacity.