Interstate pipelines operate under federal rules that require open access and public information. One result is the stream of pipeline notices that tell shippers about outages, constraints and operating conditions, the same notices NatGasPipe collects in one place.
Who regulates what
| Regulator | Oversees |
|---|---|
| FERC (Federal Energy Regulatory Commission) | Interstate pipeline rates, terms of service, open access, new interstate pipelines and LNG terminals, and market manipulation rules |
| PHMSA (U.S. DOT) | Pipeline safety: design, inspection, integrity management and operator qualification |
| State public utility commissions | Local distribution company rates and service, and intrastate pipelines (in Texas, the Railroad Commission) |
| U.S. Department of Energy | Authorizations to export and import natural gas, including LNG |
| CFTC | Futures and derivatives markets, such as NYMEX Henry Hub |
The key laws and orders
- Natural Gas Act (1938): gives FERC (originally the Federal Power Commission) authority over interstate transportation. Section 7 covers certificates to build pipelines, and Section 4 covers rate changes.
- Natural Gas Policy Act (1978): began removing federal price controls on gas at the wellhead.
- FERC Order 636 (1992): "unbundled" pipelines so they only provide transportation and storage, on an open-access basis. It also created capacity release.
- Energy Policy Act (2005): strengthened FERC's anti-manipulation and penalty powers.
- NAESB standards: the industry's business rules for nominations, cycles, electronic communications and postings, which FERC adopts into its regulations.
Tariffs and informational postings
Each interstate pipeline's tariff is its FERC-approved rulebook: services, rates, fuel, scheduling priority, imbalance penalties and operating conditions. Changing it requires a filing at FERC.
Under FERC regulations and NAESB standards, pipelines must publish informational postings on a public website, sometimes called the EBB or infopost. Required postings include:
- Notices: critical, non-critical and planned service outages
- Operationally available and unsubscribed capacity
- The tariff, and transactional reports of firm contracts and capacity releases
- Index of customers, gas quality, and locations with their codes
Types of pipeline notices
| Category | What it means | Examples |
|---|---|---|
| Critical | Affects scheduling or could result in penalties. Shippers may need to act. | OFOs, force majeure, capacity cuts, imbalance warnings, critical days, pressure problems |
| Non-critical | Informational, with no immediate operational action required | Rate and fuel changes, tariff filings, posting updates, holiday schedules, capacity release postings |
| Planned service outage | Scheduled maintenance that affects capacity | Compressor maintenance, pipeline inspections (pigging), hydrostatic tests, tie-ins for new projects |
Notices have a posted time, an effective time, and often an end time. A notice may supersede an earlier one, which happens when an outage is extended or a restriction is lifted. NatGasPipe shows current notices: those with no end date, or an end date that hasn't passed yet.
Operational flow orders and force majeure
Operational flow orders (OFOs)
An OFO is an order from the pipeline requiring shippers to take action to protect system integrity, usually to keep their receipts and deliveries in balance within a tight tolerance. OFOs often come with steep penalties for non-compliance and are common during extreme cold or heat. Pipelines may use related terms such as "critical day", "strained operating condition", or "system management order".
Force majeure
Force majeure is an unplanned event outside the pipeline's control, such as a pipe rupture, equipment failure, hurricane or other emergency, that forces capacity reductions. It's one of the most market-moving types of notice, because firm service may be cut and basis prices can jump.
How to read a notice quickly
- Category and type: is it critical, or a planned outage?
- Location: which segment, compressor station or meter is affected? Check the map.
- Capacity impact: how much is the reduction, in Dth/d or as a percentage, and which services will be cut? Interruptible and secondary-firm are usually cut first.
- Timing: the effective and end dates, in Central time.
- Action required: imbalance tolerances, OFO conditions, or deadlines for nomination changes.
- FERC regulates interstate pipelines under the Natural Gas Act. PHMSA regulates safety.
- Pipelines must post notices, capacity and tariffs publicly.
- There are three notice categories: critical, non-critical and planned service outage.
- OFOs and force majeure are the notices most likely to affect your gas and prices.
Key terms
- FERC
- Federal Energy Regulatory Commission.
- Natural Gas Act
- The 1938 law under which FERC regulates interstate pipelines.
- Order 636
- The 1992 FERC rule creating open-access transportation and capacity release.
- Tariff
- A pipeline's FERC-approved rules and rates.
- Informational postings (EBB)
- The pipeline's public website for notices, capacity and other required information.
- Critical notice
- A notice that may affect scheduling or bring penalties.
- Planned service outage
- Scheduled maintenance that reduces capacity.
- OFO
- Operational flow order: a required action to protect the system.
- Force majeure
- An unplanned event outside the pipeline's control that limits service.
- Supersede
- When a new notice replaces an earlier one.